Reliability Rule RR #153a
Reliability Rule B.1- Sudden loss of gas fuel delivery system
On Friday May 10, 2024, the NYSRC Executive Committee approved Potential Reliability Rule PRR 153a – as Reliability Rule B.1: Sudden loss of gas fuel delivery system for inclusion in its Reliability Rule & Compliance Manual.
Revision to Rule B.1 – Transmission System Planning Performance Requirements, R1 – Transmission facilities in the NYS Bulk Power System shall be planned to meet the respective performance requirements in Table B-1 and supplemental performance requirements in Table B-2 for the contingency events as specified in Table B-1.
Normal process review
Approved for posting by the NYSRC Executive Committee on March 8, 2024
Posted on March 11, 2024
Comments were due on April 24, 2024
No comments were received
The rule is effective immediately upon approval on May 10, 2024
Reliability Rule RR 154a
Revise Reliability Rule B.1-Unavailability of generating units due to gas shortage
On Friday May 10, 2024, the NYSRC Executive Committee approved Potential Reliability Rule PRR 154a– as Reliability Rule B.1 Unavailability of generating units due to gas shortage system for inclusion in its Reliability Rule & Compliance Manual.
Revision to Rule B.1 – Transmission System Planning Performance Requirements, R1 – Transmission facilities in the NYS Bulk Power System shall be planned to meet the respective performance requirements in Table B-1 and supplemental performance requirements in Table B-2 for the contingency events as specified in Table B-1.
Normal process review
Approved for posting by the NYSRC Executive Committee on March 8, 2024
Posted on March 11, 2024
Comments were due on April 24, 2024
No comments were received
The rule is effective immediately upon approval on May 10, 2024
RR #151 2-11-2024
Reliability Rule – RR #151- Reliability Rule B.5: Establishing New York Control Area (NYCA) Interconnection Standards for Large IBR Generating Facilities
On Friday February 9, 2024, the NYSRC Executive Committee approved Potential Reliability Rule PRR 151 – Establish minimum interconnection standards for Large Inverter Based Resource (IBR) Generating Facilities based on IEEE Standard 2800 – 2022 and its associated procedures document as Reliability Rule B.5: Establishing New York Control Area (NYCA) Interconnection Standards for Large IBR Generating Facilities for inclusion in its Reliability Rule & Compliance Manual.
The need for Reliability Rule B.5 is based upon: (1) recent disturbances in Texas and California where IBRs failed to perform reliably creating system supply deficits; (2) the cumulative expected magnitude of IBRs in the NYCA per New York State’s Climate Leadership & Community Protection Act (CLCPA) mandates; (3) NERC’s recommendation for Authorities Governing Interconnection Requirements (AGIR) to immediately adopt IEEE Standard 2800-2022; and (4) FERC’s RM22-12-000 NOPR on Reliability Standards to Address Inverter Based Resources. In addition, the need for the new rule is demonstrated by the New York Independent System Operator’s (NYISO) Interconnection Queue as of 6/30/23 having greater than 120,000 MW’s of Large Facility (>20MW) Inverter Based Resources.
Reliability Rule B.5 addresses interconnection study and compliance requirements for “as-designed” IBR plants based on IEEE 2800-2022.
RR #151 2-12-2024.pdf.org(nysrc.org)
RR #151 Procedure Document 2-11-2024
RR #151 Memorandum 2-12-2024.pdf(nysrc.org)
RR #151 Comment History
RR #149 4-8-22
Proposed Revised Reliability Rule – PRR 149
This rule change has two components: (1) To express the NYSRC’s LOLE criterion’s quantification of resource adequacy in terms of “loss of load event-days per year” instead of “days per year,” in order to avoid a possible misinterpretation that the NYSRC ‘s LOLE criterion allows a loss of load duration of 2.4 hours per year, and (2) to require IRM and resource adequacy assessments to include multiple reliability risk metrics in order to more fully describe loss of load events.
Normal Process Review
Posted on April 12, 2022
Comments were due on May 26, 2022
RR #149 4-8-22
RR #149 Redline 11-21-21 oroginal to the proposed version
RR#128 4-30-20
Proposed Revised Reliability Rule – PRR128 Definition of New York State Bulk Power System (NYS Bulk Power System)
The existing legacy definition of the NYS Bulk Power System requires an update due to NPCC modifications to its Document A-10 “Classification of Bulk Power System Elements” which provides the methodology to identify the Bulk Power System (BPS) Elements, or parts thereof, of the interconnected NPCC Region. NPCC Criteria and Directories, which establish more stringent requirements than the NERC Standards, are applicable to the BPS. New York is part of the NPCC Region.
Normal Process Review
Posted on May 11, 2020
Comments were due on June 26, 2020
Approved by the NYSRC Executive Committee on July 17, 2020
The rule will be incorporated into the next revision of the NYSRC Reliability Rules and Compliance Manual
PRR128 BPS Definition 6-25-2020
RR#148 3-19-20
Proposed Reliability Rule Revsion – PRR 148 Mitigation of Major Emergencies
Under current NYSRC reliability rules, the NYISO is required to declare a Major Emergency immediately if the post-contingency loading of an interface exceeds the stability or voltage collapse limits by greater than 5%. Recent events have demonstrated that exceedances meeting this criterion can in some circumstances pose little immediate threat to reliability and can be easily resolved through application of normal NYISO procedures.
Normal Process Review
Posted on April 9, 2020
Comments were due on May 25, 2020
No comments were received
Approved by the NYSRC Executive Committee on June 12, 2020
The rule will be incorporated into the next revision of the NYSRC Reliability Rules and Compliance Manual.
PRR #148 3-19-20
RR 146 4-30-20
New Reliability Rule – NYISO Interconnection requirement studies shall include, as applicable, special studies to examine the impacts of dynamically active technologies.
Studies associated with the interconnection of dynamically active transmission devices have been included in the NYISO’s interconnection process and periodic transmission planning/operating studies on an ad-hoc basis. Based on the proliferation of inverter-based resources, as well as applications of active-series/shunt compensation and HVDC connections to the NYCA system, it is proposed to include a requirement for special studies in the NYSRC Reliability Rules.
Normal Process Review
Posted on February 20, 2020
Comments were due April 6, 2020
Approved by the Executive Committee of the NYSRC on May 8, 2020
RR 146 4-30-20
The new rule will be incorporated into the NYSRC Reliability Rules and Compliance Manual when the Manual is next revised and posted on the NYSRC website.
RR 145 3-13-20
Reliability Rule Revision to Modify A.3: Rescource Adequacy Assessments
New rule replaces the current rule A.3, which now requires a 3-year resource adequacy assessment, with one that requires: (1)an annual “Next Capability Year” Resource Adequacy Assessment, (2) a biennial Long-Term Resource Adequacy Assessment, and (3) a long-term Resource Adequacy Assessment in order to inform the NYSRC of any significant updates.
Normal Process Review
Posted on January 14, 2020
Comments were due on February 28, 2020
No comments were received.
RR 145 3-13-20
Approved by the Executive Committee of the NYSRC on March 13, 2020
The new rule will be incorporated into the NYSRC Reliability Rules and Compliance Manual when the Manual is next revised and posted on the NYSRC website.
RR 147 3-13-20
Reliability Rule Revision: NYSRC Resource Adequacy Criterion
Rule clarifies that the NYSRC Resource Adequacy LOLE Criterion applies to all resource capacity probability assessments, including resource adequacy analysis (see related PRR145) and IRM requirement studies.
Normal Process Review
Posted on January 14, 2020
Comments were due on February 28, 2020
No comments were received
RR 147 3-13-20
Approved by the Executive Committee of the NYSRC on March 13, 2020
The new rule willl be incorporated into the NYSRC Reliability Rules and Compliance Manual when the Manual is next revised and posted on the NYSRC website.
RR 144 2-8-18
Reliability Rule Revision C.3 Outage – Coordination Requirement 4 and Requirement 6
The intent of existing R4 will be incorporated into the procedures stipulated in existing R6 of this Rule so that facility owners are aware of their obligation to restore maintenance outages expeditiously in the case of an emergency. Existing R4 will be retired, and subsequent Requirements will be renumbered.
Normal Process Review
Posted on February 12, 2019
Comments were due on March 29, 2019
RR 144 C.3 Outage Coordination
No comments were received.
The new rule will be incorporated into the NYSRC Reliability Rules and Compliance Manual when it is next revised and posted on the NYSRC website.
RR 140 2-8-18
Reliability Rule Revision to Modify A.1: Establishing NYCA Installed Reserve Margin
Requirements to clarify A.1 requirements and to revise to be consistent with NPCC Directory 1 resource adequacy requirements.
Normal Process Review
Posted on March 19, 2018
Comments were due on May 3, 2018
PRR 140 Establishing NYCA Installed Reserve Margin
Approved by the NYSRC Executive Committee on May 11, 2018
The approved rule will be included in the next revision of the NYSRC Reliability Rules and Compliance Manual
RR 141 2-8-18
Reliability Rule Revision of A.2: Establishing Load Serving Entity Installed Capacity
Requirements to clarify NYISO locational requirement (LCR) analysis requirements and eliminate deliverable external area capacity requirements which should more appropriately be covered in Policy 5.
Normal Process Review
Posted on March 19, 2018
Comments were due on May 3, 2018
No comments were received
PRR 141 Establishing Load Serving Entity Installed Capacity
Approved by the NYSRC Executive Committee on May 11, 2018
The approved rule will be included in the next revision of the NYSRC Reliability Rules and Compliance Manual
RR 139
Reliability Rule G.2: Loss of New York CIty Gas Supply Revisions
Normal Process Review
Posted on the NYSRC website on December 12, 2017
Comments were due on January 26, 2018
No comments were received
Approved by the NYSRC Executive Committee on February 9, 2018
PRR139 – Reliability Rule G.2: Loss of New York City Gas Supply Revisions
The approved rule will be included in the next revision of the NYSRC Reliability Rules and Compliance Manual
RR 138-17-02
Reliability Rule G.3: Loss of Long Island Gas Supply Revisions
Normal Process Review
Posted on the NYSRC Website on October 23, 2017
Comments were due on December 7, 2017
No Comments were received
Approved by the NYSRC Executive Committee on December 8, 2017
PRR138-17-02 Reliability Rule G.3: Loss of Long Island Gas Supply Revisions
The approved rule will be included in the next revision of the NYSRC Reliability Rules and Compliance Manual
RR#137 Request from the RRS to Retire Reliability Rule D.2
Purpose of the Request: to Conform NYSRC Rules to NERC and NPCC rules
Final Rule (Retirement) Approved on September 8, 2017
Retirement of Rule D.2 Reflected in NYSRC Reliability Rule and Compliance Manual Revision 41
Request from the New York Power Authority for Modification of Exception #12
Purpose of request: to accommodate planned maintenance
Final Reliability Rule Approved on August 11, 2017
Exceptions to Reliability Rules Revision 10, August 11, 2017
RR#136-17-01
Reliability Rule I.4 Clarification
Normal Process Review
Posted on February 17, 2017
Comments Due on April 3, 2017
Final Rule Approved on April 13, 2017
RR#136-17-01.pdf
RR#135-16-09
Reliability Rule G.4 Clarification
Normal Process Review
Posted on November 15, 2016
Comments Due on December 30, 2016
Final Rule Approved January 12, 2017
RR#135-16-06.pdf
RR#131C-16-06
Dual Fuel Testing Requirements
Normal Process Review
Posted on September 12, 2016
Comments Due on October 27, 2016
Final Rule Approved November 10, 2016
RR#131C-16-06.pdf
PRR#133-16-07
F System Restoration
Normal Process Review
Posted on September 12, 2016
Comments Due on October 27, 2016
Final Rule Approved November 10, 2016
RR#133-16-07.pdf
PRR#134-16-08
I.5 Disturbance Recording
Normal Process Review
Posted on September 12, 2016
Comments Due on October 27, 2016
Final Rule Approved Noveber 10, 2016
RR#134-16-08.pdf
RR#132-16-05
I.4 Transmission Data
Normal Process Review
Posted on July 1, 2016
Comments Due on August 15, 2016
Final Rule Approved September 9, 2016
RR#132-16-05.pdf
RR#130-16-04
Revision of Reliability Rule C.1,
Establishing Operating Transfer Capabilities
Normal Process Review
Posted on April 14, 2016
Comments Due on May 31, 2016
Final Rule Approved June 10, 2016
PRR#130-16-04
RR#120-16-01
Revision of Reliability Rule B.1,
Transmission System Planning
Performance Requirements
Normal Process Review
Posted on January 14, 2016
Comments Due on February 28, 2016
PRR#120-16-01
RR#121-16-02
B-R2: Transmission Planning Assessments
Normal Process Review
Posted on January 14, 2016
Comments Due on February 28, 2016
PRR#121-16-02
RR#122-16-03
Revision of C-R1, Establishing
Operating Transfer Capabilities
Normal Process Review
Posted on January 14, 2016
Comments Due on February 28, 2016
PRR#122-16-03
RR#127-15-01
C-R1 and C-R2 Table C-1 Revision
Normal Review Process
Posted on May 8, 2015
Comments Due by June 29, 2015
Final Rule Approved August 14, 2015
Final Rule: RR #127-15-01
RR #REP-18-14-19
Establish Operating Transfer Limits
Normal Review Process
Posted on September 17, 2014
Comments Due by November 3, 2014
Final Rule Approved November 7, 2014
Final Rule: RR #REP-18-14-19
RR #REP-19-14-20
Post-contingency Operation
Normal Review Process
Posted on September 17, 2014
Comments Due by November 3, 2014
Final Rule Approved November 7, 2014
Final Rule: RR #REP-19-14-20
RR #REP-20-14-21
Outage Coordination
Normal Review Process
Posted on September 17, 2014
Comments Due by November 3, 2014
Final Rule Approved November 7, 2014
Final Rule: RR #REP-20-14-21
RR #REP-21-14-22
Operation Prior to and During Extreme
Weather Conditions & SMDs
Normal Review Process
Posted on September 17, 2014
Comments Due by November 3, 2014
Final Rule Approved November 7, 2014
Final Rule: RR #REP-21-14-22
RR #REP-22-14-23
Fault Current Assessment
Normal Review Process
Posted on September 17, 2014
Comments Due by November 3, 2014
Final Rule Approved November 7, 2014
Final Rule: RR #REP-22-14-23
RR #REP-23-14-24
Applications of the NYSRC Reliability Rules
Normal Review Process
Posted on September 17, 2014
Comments Due by November 3, 2014
Final Rule Approved November 7, 2014
Final Rule: RR #REP-23-14-24
RR #REP-24-14-25
Exceptions to the NYSRC Reliability Rules
Normal Review Process
Posted on September 17, 2014
Comments Due by November 3, 2014
Final Rule Approved November 7, 2014
Final Rule: RR #REP-24-14-25
RR #REP-25-14-26
Real Time Operations of the NYS
Bulk Power System
Normal Review Process
Posted on September 17, 2014
Comments Due by November 3, 2014
Final Rule Approved November 7, 2014
Final Rule: RR #REP25-14-26
RR #REP-26-14-27
New York City Operations
Normal Review Process
Posted on September 17, 2014
Comments Due by November 3, 2014
Final Rule Approved November 7, 2014
Final Rule: RR #REP26-14-27
RR #REP-27-14-28
Loss of Gas Supply – New York City
Normal Review Process
Posted on September 17, 2014
Comments Due by November 3, 2014
Final Rule Approved November 7, 2014
Final Rule: RR #REP27-14-28
RR #REP-28-14-29
Loss of Gas Supply – Long Island
Normal Review Process
Posted on September 17, 2014
Comments Due by November 3, 2014
Final Rule Approved November 7, 2014
Final Rule: RR #REP28-14-29
RR #REP-29-14-30
Applications of the NYSRC Reliability Rules
Normal Review Process
Posted on September 17, 2014
Comments Due by November 3, 2014
Final Rule Approved November 7, 2014
Final Rule: RR #REP29-14-30
RR #119-14-14
Review of NYCA Resource Adequacy
Normal Review Process
Posted on August 11, 2014
Comments Due by September 25, 2014
Final Rule Approved October 9, 2014
Final Rule: RR #REP-14-14
RR #REP-14-14-15
Review of Resource Adequacy
Normal Review Process
Posted on August 11, 2014
Comments Due by September 25, 2014
Final Rule Approved October 9, 2014
Final Rule: RR #REP-14-14-15
RR #REP-15-14-16
Transmission System Planning Requirements
Normal Review Process
Posted on August 11, 2014
Comments Due by September 25, 2014
Final Rule Approved October 9, 2014
Final Rule: RR #REP-15-14-16
RR RR #REP-16-14-17
Transmission System Assessments
Normal Review Process
Posted on August 11, 2014
Comments Due by September 25, 2014
Final Rule Approved October 9, 2014
Final Rule: RR #REP-16-14-17
RR #REP-17-14-18
List of Power System Facilities
Normal Review Process
Posted on August 11, 2014
Comments Due by September 25, 2014
Final Rule Approved October 9, 2014
Final Rule: RR #REP-17-14-18
RR#REP-12-14-12
Reliability Rule G-R1: NYCA System Restoration Plan
Normal Review Process
Posted on June 20, 2014
Comments Due by August 4, 2014
Final Rule Approved September 12, 2014
Final Rule: RR#REP-12-14-12
RR#REP-13-14-13
Reliability Rule G-R2: System Restoration Training and
Simulation Programs.
Normal Review Process
Posted on June 20, 2014
Comments Due by August 4, 2014
Final Rule Approved September 12, 2014
Final Rule: RR#REP-13-14-13
RR#REP-09-14-09
F-R1: Mitigation of Major Emergencies
Posted on March 19, 2014
Comments Due by May 5, 2014
Final Rule Approved May 9, 2014
Final Rule: RR#REP-09-14-09
RR #REP-10-14-10
F-R2: Under frequency load Shedding
Posted on March 19, 2014
Comments Due by May 5, 2014
Final Rule Approved May 9, 2014
Final Rule: RR#REP-10-14-10
RR #REP-11-14-11
J-R1: Control Center Communications
Posted on March 19, 2014
Comments Due by May 5, 2014
Final Rule Approved May 9, 2014
Final Rule: RR#REP-11-14-11
RR#116A-13-01:
Reliability Rule G-R1 Revision and new Local
Reliability Rule I-R6 and related Measurements:
Identification of Black Start Resources Needed
for an Effective System Restoration Plan.
Normal Review Process
Posted on August 19, 2013
Comments Due by October 2, 2013
Final Rule Approved April 10, 2014
Final Rule: RR#116A-13-01
RR#117-14-07:
List of NYS Bulck Power System Facilities
Normal Review Process
Posted on February 17, 2014
Comments Due by April 3, 2014
Final Rule Approved April 10, 2014
Final Rule: RR#117-14-07
RR#118-14-06:
Retirement of System Protection Reliability
Rules H-R1 and H-R2 and related Measurements
Normal Review Process
Posted on January 31, 2014
Comments Due by March 18, 2014
Final Rule Approved April 10, 2014
Final Rule: RR#118-14-06
RR#REP-03-14-01
C-R1: Verification Testing of
Resource Capacity
Normal Review Process
Posted on January 14, 2014
Comments Due by February 28, 2014
Final Rule Approved April 10, 2014
Final Rule: RR#REP-03-14-01
RR#REP-08-14-08
D-R1: Establishing the Minimum Level
of Operating Reserve
Normal Review Process
Posted on February 17, 2014
Comments Due by April 3, 2014
Final Rule Approved April 10, 2014
Final Rule: RR#REP-08-14-08
RR#REP-05-14-03
C-R3: Load Forecasting
Reserve Margin Requirement
Normal Review Process
Posted on January 14, 2014
Comments Due by February 28, 2014
Final Rule Approved March 14, 2014
Final Rule: RR#REP-05-14-03
RR#REP-06-14-04
C-R4: Transmission Data
Normal Review Process
Posted on January 14, 2014
Comments Due by February 28, 2014
Final Rule Approved March 14, 2014
Final Rule: RR#REP-06-14-04
RR#REP-07-14-05
C-R4: Transmission Data
Normal Review Process
Posted on January 14, 2014
Comments Due by February 28, 2014
Final Rule Approved March 14, 2014
Final Rule: RR#REP-07-14-05
RR#REP-04-14-02
C-R2: Generating Unit Availability and
Special Case Resources Performance
Reserve Margin Requirement
Normal Review Process
Posted on January 14, 2013
Comments Due by February 28, 2013
Final Rule Approved March 14, 2014
Final Rule: RR#REP-04-14-02
RR#REP-02-13-03
A-R2: Establishing the Load Serving Entity
Installed Capacity and Deliverable External
Area Installed Capacity
Normal Review Process
Posted on November 15, 2013
Comments Due by December 31, 2013
Final Rule Approved January 10, 2014
Final Rule: RR#REP-02-13-03
RR#REP-01-13-02
A-R1: Establishing the NYCA Installed
Reserve Margin Requirement
Normal Review Process
Posted on November 15, 2013
Comments Due by December 31, 2013
Final Rule Approved January 10, 2014
Final Rule: RR#REP-01-13-02
RR#114-13-01
System Restoration Measurements G-M1 and G-M2
Normal Review Process
Posted on November 14, 2012
Comments Due by December 29, 2012
Final Rule Approved January 11, 2013
Final Rule: RR#114-13-01 &
NYSRC Black Start Paper on System Steam Unit
Testing for PRR-114
RR#112-12-03
System Restoration Measurements G-M1 and G-M3
Expedited Review Process (See Policy 1)
Posted on September 14, 2012
Comments Due by September 29, 2012
Final Rule Approved October 12, 2012
Final Rule: RR#112-12-03
NYSRC Black Start Paper on Steam Unit
Testing September 6 2012
RR#109-12-01
Revision to Reliability Rule C-R2 and
New Related Measurements C-M14 and C-M15
Normal Review Process
Posted on February 11, 2012
Comments Due by March 26, 2012
Final Rule Approved May 11, 2012
Final Rule: RR#109-12-01
RR#111-12-02
Extreme Contingency Table B(i) Revision
Normal Review Process
Posted on March 18, 2012
Comments Due by April 30, 2012
Final Rule Approved May 11, 2012
Final Rule: RR#111-12-02
RR#107-11-01
Revision to Compliance Elements for Measurements C-M8, H-M2,
I-M1, I-M2, and J-M2
Normal Review Process
Posted on September 12, 2011
Comments Due by October 28, 2011
Final Rule Approved November 10, 2011
Final Rule: RR#107-11-01
RR#108-11-02
Major Emergency Declaration Refinement of Reliability Rule F-R1,
“Transmission Thermal Overloads”
Normal Review Process
Posted on September 12, 2011
Comments Due by October 28, 2011
Final Rule Approved November 10, 2011
Final Rule: RR#108-11-02
RR#106-10-04
Blackstart Provider Requirements –
Modification to Measurements G-M1 and G-M3
Normal Review Process
Posted on November 16, 2010
Comments Due by January 4, 2010
Final Rule Approved January 7, 2010
Reliability Rule #106-10-04
RR#104-10-02
“Verification Testing of Resource Capacity:
Modification to Measurements CM-1 and CM-3”
Normal Review Process
Posted on August 16, 2010
Comments Due by October 1, 2010
Final Rule Approved November 12, 2010
RR#104-10-02
RR#105-10-03
Exceptions Review: Modification to Measurement E-M9
Normal Review Process
Posted on August 16, 2010
Comments Due by October 1, 2010
Final Rule Approved October 8, 2010
RR#105-10-03
RR#103-10-01
System Data Requirements
Normal Process Review
Posted on or about March 11, 2010
Comments Due by May 21, 2010
Final Rule Approved July 9, 2010
RR#103-10-1
RR#102-09-03
Monthly Operating Report – Measurement K-M2d
Normal Process Review
Posted on October 19, 2009
Comments Due by December 3, 2009
Final Rule Approved December 4, 2009
RR#102-09-03
RR#101-09-02
Generating Unit Availability Revision to Measurements C-R2 and C-M4 through C-M6
Normal Process Review
Posted on August 18, 2009
Comments Due by October 5, 2009
Final Rule Approved October 9, 2009
RR#101-09-02
PRR#99-09-01
System Restoration Reliability and Measurement Modifications
Normal Review Process
Posted on April 20, 2009
Comments Due by June 4, 2009
Final Rule Approved August 14, 2009
Final Rule: RR#99-09-01
RR#96-08-03
Verification Testing of Resource Capacity
Revision to Measurements C-M1 and C-M2.
Normal Process Review
Posted on November 20, 2008
Comments Due by Jan. 5, 2009
Final Rule: RR#96-08-03
RR#98-08-02
NYCA Transmission Review – Measurement K-M2a Modifications
Normal Process Review
Posted on October 16, 2008
Comments Due by Dec 5, 2008
Final Rule: RR#98-08-02
RR#95-08-01
Modification of System Restoration Measurements G-M2 and G-M4
Normal Process Review
Posted on or about March 25, 2008
Comments Due by May 8, 2008
Final Rule Approved May 9, 2008
Final Rule: RR#95-08-01
RR#94-07-07
Exceptions to the NYSRC Reliability Rules
Normal Review Process
Posted on or about Oct. 15, 2007
Comments Due by Nov. 30, 2007
Final Rule Approved December 14, 2007
Final Rule: RR#94-07-07
RR#93
Revisions to Operating Reserve Resource Eligibility
Normal Review Process
Posted on or about Sept. 28, 2007
Comments Due by Nov. 12, 2007
Final Rule Approved December 14, 2007
Final Rule: RR#93-07-06
RR#88-07-04
Classification of Loss of Generator Gas Supply
Normal Review Process
Posted on or about April 21, 2007
Comments Due by June 5, 2007
Final Rule Approved July 13, 2007
Final Rule: RR#88-07-04
RR#91-07-03
Modification to Rule B-R4, Extreme Contingency Assessment
Normal Review Process
Posted on or about April 21, 2007
Comments Due by June 5, 2007
Final Rule Approved July 11, 2007
Final Rule: RR#91-07-03
RR#92-07-05
Measurement G-R2
Normal Review Process
Posted on or about April 21, 2007
Comments Due by June 5, 2007
Final Rule Approved July 13, 2007
Final Rule: RR#92-07-05
RR #86-07-01
Modification of Rules for Transmission Capability – Planning
Normal Review Process
Posted on or about February 15, 2007
Comments Due by April 1, 2007
Final Rule Approved April 13, 2007
Final Rule: RR#86-07-01
RR #90-07-02
Modification to Rule B-R5, Restoration
Normal Review Process
Posted on or about February 15, 2001
Comments Due by April 1, 2007
Final Rule Approved April 13, 2007
Final Rule: RR#90-06-02
RR#89-06-02
Modification of NYSRC Reliability Rule, A-R1
Normal Review Process
Posted on or about 11/14/06
Comments Due by 12/28/06
Final Rule Approved 01/05/07
Final Rule: RR#89-06-02
RR#85-06-01
Minimum Operating Reserve Requirements, D-R2
Normal Process Review
Posted on or about June 14, 2006
Comments due by July 31, 2006
Final Rule Approved August 11, 2006
Final Rule: RR#85-06-01
RR#76-05-05
System Restoration Rules G-R1, G-R2 and G-R3
Normal Review Process
Posted on January 19, 2006
Comments Due by March 6, 2006
Final Rule Approved March 10, 2006
Final Rule: RR#76-05-05
RR#80-05-09
Resource Outage Data – Modification of Measurement C-M5 and
Related Compliance Elements
Normal Review Process
Posted on December 16, 2005
Comments Due by February 22, 2006
Final Rule Approved March 10, 2006
Final Rule: RR#80-05-09
RR#81-05-10
Requirements for Reviewing NYISO Fault Duty Assessment – Modification
of Measurement E-M7 and Related Compliance Elements
Normal Review Process
Posted on or about December 16, 2005
Comments Due by January 30, 2006
Final Rule Approved March 10, 2006
Final Rule: RR#81-05-10
RR#82-05-11
Requirements for Reporting Load to be Shed Through Load Shedding – Modification of Measurement F-M4 and Related Compliance Elements
Normal Review Process
Posted on December 16, 2005
Comments Due by January 30, 2006
Final Rule Approved March 10, 2006
Final Rule: RR#82-05-11
RR#83-05-12
Con Edison and LIPA Requirements for Operating Their Systems in Accordance
With Local Rules – Modification of Measurements I-M5 & I-M6 and Related
Compliance Elements
Normal Review Process
Posted on December 16, 2005
Comments Due by January 30, 2006
Final Rule Approved March 10, 2006
Final Rule: RR#83-05-12
RR#79-05-08
Applications of NYSRC Reliability Rules
Normal Process
Posted on November 12, 2005
Comments Due December 27, 2005
Final Rule Approved January 13, 2006
Final Rule: RR#79-05-08
RR #74-05-07
Modification of Data Requirements Measurements C-M9 and C-M11
Normal Process Review
Posted on or about September 23, 2005
Comments Due by November 7, 2005
Final Rule Approved December 7, 2005
Final Rule: RR#74-05-07
RR#69-05-02
Disturbance Recording
Review Process
Posted on June 14, 2005
Comments Due by July 29, 2005
Final Rule Approved August 12, 2005
Final Rule: RR#69-05-02.pdf
RR#73-05-04
Verification Testing of Resource Capacity
Normal Review Process
Posted on August 17, 2005
Comments Due by October 2, 2005
Final Rule: Approved by October 14, 2005
Final Rule: RR#73-05-04
RR#78-05-06
Modification of Operation During Major Emergency
Normal Review Process
Posted on August 17, 2005
Comments Due by October 2, 2005
Final Rule Approved October 14, 2005
Final Rule: RR#78-05-06
RR#72-05-03
Extreme System Conditions Assessment
Normal Review Process
Posted on or about April 7, 2005
Final Rule Approved June 10, 2005
Final Rule: RR#72-05-03.pdf
RR#77-05-01
Normal Review Process
Posted February 2, 2005; Comments Due by
March 18, 2005
Final Rule Approved April 8, 2005
Final Rule: RR#77-05-01.pdf
Comments on Draft Reliability Rules
None at this time
Responses to Comments Received
None at this time